Conservatory Re-Build – Day 15


Each day now seems to bring significant changes. Today the guys have been focussed on assembling the framework, on which the plasterboard will be fixed, to create the perimeter ceiling. The system they are using is Livinroom by Ultraframe. The following photos show the results of their days efforts.

Conservatory - Showing the completed framework at the southern end.
Conservatory – Showing the completed framework at the southern end.

The garage door beside my wife, is yet to be raised, otherwise it won’t open when the floor is raised.

5J7A0641_1
Conservatory – Showing the completed framework at the northern end.
5J7A0642_1
Conservatory – Showing the completed framework adjoining the house. This is much wider than on the other three sides as it has to take in the existing roof overhang, the large box gutter and also provide space for the down lighters.
5J7A0643_1
Conservatory – Stillno bi-fold doors. These are being left until later, to prevent any damage while the raised floor is installed.

What a difference a day makes. Not only did the guys install the framework but they did a huge clean up both within the new structure and also in the garden. It no longer looks like a builders yard.

2 thoughts on “Conservatory Re-Build – Day 15”

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Twitter picture

You are commenting using your Twitter account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s

%d bloggers like this: