Conservatory Re-Build – Day 9


5J7A0480_1
Conservatory – South wall blockwork completed and connected to the garage.
5J7A0481_1
Conservatory – Although the blockwork is to full height theouter brickwork is yet to reach the same height.
5J7A0482_1
Conservatory – North end window pillars are complete, both blockwork and brickwork.
5J7A0484_1
Conservatory – Facia board has been cut into in preparation for connection to the new build.
5J7A0485_1
Conservatory – Close up of intersection between south wall blockwork and the garage wall.