On Tuesday 5th July, 22 Landscape Architects and invited guests from across the county visited the West of Waterlooville development to see best practice in Sustainable Urban Drainage systems (SUDs). The 247 hectare site has a custom designed infrastructure to reduce the risk of flooding to homes and promote biodiversity. Rain water is collected in channels […]

via SUDs Explored — West of Waterlooville

It is a well-known fact that many of the flood problems around the UK have been exacerbated by the continual building of large housing estates and associated road systems. These prevent the normal, slow soak away of rain water. Instead the water is channeled away via drains and gutters, moving the water down stream at an ever-increasing speed and volume. Ultimately dumping the water into river systems that never had to cope with this level of flow before.

So I am pleased that the developers were ahead of the game when planning the drainage system for the West of Waterlooville site. I would have expected nothing less.

However, in these environmentally aware times, we are always being encouraged to conserve water. So why does all of this carefully controlled “filtered” waste water get channeled out to sea ?

Surely, if the developers were so ahead of the game they would have designed the drainage system so that the water was pumped away to local reservoirs.

Similarly, I would expect the Welbourne developers would be looking hard at the drainage and waste water management.

 

Conservatory Rebuild – Days 35 thru 37


Not much happening since Saturday. Craig and Connor arrived mid afternoon with a barrow load of ready mixed cement and set about laying the final steps and reinstating the side access slabs. Since then the weather has been atrocious with heavy tropical style rainstorms. Yesterday, the final slabs were laid. However, the heavens opened and to quote the song “Down came the rain”. The side access has always turned into a water chute during stormy weather, so much so that we have considered making into a water feature. Yesterday was no exception.

Conservatory - Side access slabs and some erosion from the water that fell from the sky
Conservatory – Side access slabs and some erosion from the water that fell from the sky

There was so much rain water and the cement was so fresh that the last paver laid has shifted. The guys will have to come back and re-lay it, when we have a dry day. Then they can also grout the slabs on the steps.

Also putting in an appearance yesterday was Angus.

Conservatory - Door stay fitted.
Conservatory – Door stay fitted.

He arrived and fitted the “stay” for the utility room door as well as making good the soffit that had been cut away to make the connection between the bungalow and the new conservatory.

We are creeping towards completion.

The search for the Scarlett Pimpernel goes on unabated and needless to say we are still minus the radiator for the living space, which in turn is preventing the last strip of skirting from being fitted. The bi-fold doors are still missing their magnetic catch, as well as the last bit of rubber seal and the hidey / slidey door furniture is still to be fitted.

We also have some issues with the final finish of some of the plasterwork around the perimeter ceiling but these are all minor items and shouldn’t take long to sort out.

No, the big issue, and the worst irritant is the missing radiator !!