Scottish Power Not So SmartMeter


A couple of years ago I submitted to the wave of advertising singing the praises of SmartMeters. I contacted our energy company and a smart meter was duly installed. One of the primary reasons for me agreeing to the smart meter installation was to mitigate the sheer mountain of stuff that I had to move whenever Scottish Power wanted a meter reading. Invariably their rep would turn up while we were eating. Our house is one of six , of this style, on this development. However, it is the only one that has its garage attached to the end of the house. The utility meters are situated on that end wall, which means that the meters are inside the garage. A big thank you to the builders for that decision.

So meter installed and I can now read my energy usage via an app on my phone. Around December of 2021 the smart meter ceased recording my gas usage. Scottish Power continued taking my payments but started sending me messages similar to the one below …

We’re unable to communicate with your meter at the moment. To help us provide you with an accurate bill, please read your meter and submit the reading at http://www.scottishpower.co.uk/my-account/meter-readings/authenticate?ca=81401146019 Need help to read your meter? Visit http://www.scottishpower.co.uk/read-your-meter

Earlier this year, due to another request for a meter reading, I caved in and moved my junk to gain access to the meters. Did the electric reading no bother. However the gas meter display was blank. Obviously I was not surprised since they had not been able to take the readings since the previous December. This being August. A phone call was required.

After being on hold for a very long time I eventually got to speak to a rep. She gave me instructions on how to wake up my meter and take the reading. Of course, I took this opportunity to raise the issue of my less than smart meter and its inability to take the gas readings.

I asked why they, Scottish Power, knowing my meter wasn’t passing on my energy usage data, hadn’t sent someone out to fix it ???

Then she dropped the bomb …… I wasn’t alone !!!

Apparently, many of us who jumped on the SmartMeter bandwagon were literally in the same boat. We had the Gen 1 meters and they had a software bug. Those who had delayed getting the SmartMeter typically had the Gen 2 meter and were not experiencing issues.

Don’t worry she said, because a fix is going to be rolled out. Everyone will be back up working by the end of October. Well, you guessed it. October came and then became a fast receding memory. No Fix.

Nothings changed. Well actually that isn’t entirely true. My SmartMeter no longer records the electricity usage. So now, no gas readings, no electricity readings. Unless I move my junk and take a manual reading. Bloody marvellous.

So, Scottish Power continue to inform me that my SmartMeter isn’t working, continue to request manual readings and continue to do nothing about fixing my meter.

Biggest slap in the face is that they continue to advertise the merits of having a smart meter installed.

And worst of all, due to the current energy crisis, I am trapped as their customer.

No energy companies are taking on new customers.

Vacances en France – 2018 – Carrière Wellington


On our last day stopping with the rellies, we headed out to Arras. On previous visits we had only ever dipped our toes into what this town has to offer and we had passed by on many occasions.

One thing we did know was that Arras is sitting on a maze of tunnels, and therefore felt it was way past time for us to find out more.

So of we went to Carrière Wellington.

Here is what Wikipedia has to say…


The Carrière Wellington is a museum in Arras, northern France. It is named after a former underground quarry which was part of a network of tunnels used by forces of the British Empire and Commonwealth during the First World War. Opened in March 2008, the museum commemorates the soldiers who built the tunnels and fought in the Battle of Arras in 1917.

500 miners from the New Zealand Tunnelling Company, including Māori and Pacific Islanders, recruited from the gold and coal mining districts of the country, were brought in to dig 20 kilometres (12 mi) of tunnels. They worked alongside Royal Engineer tunnelling companies, made up by now of British coal miners and expert tunnellers who had built the London Underground. Many of them were “Bantams“, soldiers of below average height who had been rejected from regular units because they did not meet the height requirements; others had been initially rejected as too old, but their specialist mining experience made them essential for the tunnelling operation.

Thousands of soldiers were billeted in the tunnels for eight days prior to the start of the Arras offensive on 9 April 1917. At 05:30 that morning, exits were dynamited to enable the troops to storm the German trenches. The Germans were taken by surprise and were pushed back 11 km (6.8 mi). This counted as an extraordinary success by the standards of the time. However, the offensive soon bogged down and it was eventually called off after casualties reached 4,000 a day.


From <https://en.wikipedia.org/wiki/Carri%C3%A8re_Wellington>
Ready for the tour

Hopefully, the following pictures, will give a sense of the conditions under which the men of the New Zealand Tunelling Company worked and also the cramped space that thousands of men endured prior to beginning the attack.

The following image shows just one of the many stairways, to be used by the men as they exited the tunnels. They would have climbed in single file, popping out above ground to confront the German soldiers. I wonder if the first man up was a volunteer ?

With all the men inhabiting the tunnels a fair amount of drinking water would be required. They had their own water supply. The following image shows a water trough to the left. The trough is full of water, showing just how clean the water was. Center of the image is a mirror whose reflection shows the well from which the water comes.

Also from Wikipedia …..


The Carrière Wellington museum consists of a visitor centre displaying historic artifacts and presenting the historical context of the Battle of Arras, including the work of the tunnelers and the military strategy that underlay the tunnels’ construction. It was opened to the public on 1 March 2008.
The tunnels are accessed via a lift shaft that takes visitors approximately 22 m (70 ft) under the ground inside the galleries of the underground quarry. The tour consists of both guided and audio-guided tours on a planned path accessible for wheelchairs. The visitors discover the development of the strategy of the Battle of Arras, and also the daily life of the tunnelers of New-Zealand and the soldiers of the British Expeditionary Forces sent in these tunnels to prepare this battle.




The site is also a memorial dedicated to the battle of Arras, with a memorial wall remembering all the regiments involved in the battle of Arras. Since the Hundred Years of the battle in 2017, a second memorial wall is dedicated to portraits of NZ Tunnelers, and a statue was installed in the park for the remembrance of these tunnelers. Each year, a ceremony is organised at 6.30 am on April 9th.

An interesting and enlightening day. I am ever amazed at the amount of effort, the soldiers of the First World War, expended for so little gain.

As this was to be our last day, before heading back to good ol’ Blighty, we all went out for a family meal. And so, after a good meal at Beers & Co., it was back to Achiete and bag packing.

%d bloggers like this: