Fears over future of field at centre of three Hampshire villages


Fears over future of field at centre of three Hampshire villages – Portsmouth News.

The developers are out for one thing and one thing only, to line their own pockets and the sad thing is that our local planners are letting them get away with it. Taylor Wimpey are threatening to build 220 new homes on a beautiful piece of countryside just a short distance away  from an existing development of 275 homes.
Lynn McIver, speaking for Taylor Wimpey, has said

 ‘We are confident that this scheme will provide an attractive and sustainable development of much-needed housing in the area, as well as delivering affordable housing for local people.’

Decimating our local heritage, our beautiful countryside is never “attractive”. Hampshire is being eroded, one plot, one field, one farm at a time. This is just the latest foray by the developers and if allowed to proceed will be a disaster.

A consultation is scheduled to be held in Clanfield Memorial Hall, South Lane, on March 7, from 2pm to 7.30pm.

Be there and make your voices heard.

See also http://wp.me/pVDP6-1WO

West of Waterlooville Forum Friday 22nd November 2013


If, per their drawings and graphics, they actually create the variety of tasteful properties promised. If the legacy they leave us with is a new residential site with a bit of style, instead of the typically  boring and uniform boxes which has become the norm. Then I for one am for this development.

It’s a shame that the initial West of Waterlooville development by Taylor Wimpey at “Wellington Park” (Dukes Meadow, Old Park Farm) off the Hambledon Road is so awful. My observations, so far, of the Wellington Park  development are that it is overcrowded and is of a mediocre design. Taking the road around the perimeter, towards the new tip, does not give a very good perspective. The site presents a pretty bland face to Joe Public.

And let’s spare a thought for the folks who had a view across Hambledon Road, across open fields and up the back of Portsdown Hill. They certainly have not been presented with a sympathetic replacement for that marvellous view. Rather they have had multistory apartments built directly in front of them. The equivalent of the developers, the planners and the architects presenting the home owners with a corporate middle finger.

I do hope that Phase 2 of Berewood is handled with a bit more sensitivity.

West of Waterlooville

For those who could not attend the forum I’ve attached the presentation given by Redrow Homes for Phase 2 of the Berewood Site

REDR130524 Berewood Forum – Low Res

View original post

West Of Waterlooville


The proliferation of houses moves on apace. Moving ahead of and despite the lack of jobs for the future residents.

West of Waterlooville

Taylor Wimpey are starting to prepare for their Phase 3 and 4 build outs. Next week, they will be felling a few trees that they are permitted to remove. Trees will be checked by an ecologist for recent evidence of bats, and appropriate steps taken if necessary, although all trees were checked not long ago.
Tomorrow, there will be a walk through of the Western Open Space, in preparation for any planting or other action required.

Grainger PLC announced at the West of waterlooville Forum that they are now a Registered Provider for social housing. The RP will be a subsidiary entity to Grainger plc. It will enable Grainger to retain greater control over the management of the affordable homes within its development pipeline over the coming years through the RP, providing greater community building capabilities

View original post